January, 2014

Ein Bokek

Ein Bokek
  • Location: M.A. Tamar, Ein Bokek, Israel
  • Project Type: Design
  • Wastewater: Domestic
  • Volume: 3,500 m3/day

Description

Overview

In 2014 Regional Authority "tamar" located near the Dead Sea initiate upgraded to their WWTP.

The plant handle wastewater of the all the Hotels in the area 3000-3500 m³/d.

Requirements

  1. To meet the strict Requirements of the Israeli Health and Environmental Authorities
  2. Reuse of the treated wastewater for irrigation

Design

Triple – T was chosen to design & support the operation. The upgraded included:

-          Upgrading the aeration system of the aerobic reactors.

-          New secondary clarifier (Third in the WWTP)

-          Full sludge treatment system including aerobic digestion, thickening and dewatering.

Estimated completion of upgrade - February 2016